Anhui Climbing Tiger Development Equipment Co., Ltd.

Water expansionposition:homeWater expansion

Absolute bridge

date:[2018-10-29]     pk_hits:
Absolute bridge

Water expansion equipment - cliff bridge


First, the project name: water expansion equipment - cliff bridge (aka: cliff cross wall, plank road bridge)


Second, the project specifications: 10 * 0.5 * 2.5m (length * width * height)


Third, the project material: Ф 159mm steel pipe, Ф 76mm steel pipe, channel steel, white iron plate, etc.


4. Project introduction: The operator walks on the uneven plank road, that is, the wooden pile on the rock wall, from one end of the bridge to the other end.


V. Project purpose:


1. Exercise the flexibility of the body and the courage to challenge yourself, to overcome psychological fear;


2. Eliminate all distractions and disturbances, divert attention, and increase guts and perseverance;


3. Develop thinking skills and learn to use wisdom to win and teamwork awareness.


Six, note:


1, the length can be designed according to the width of the water;


2. This project has certain risks. Users are advised to do their best. Underage and special people need to be guarded by guardians. They need to use their bodies when using them. It is forbidden to play and play during use. It is strictly forbidden to make dangerous actions.


Previous:Sway bridge
Next:Drilling bridge

Contact us

Contact

Welcome to inquire
  • Add:No.119, Comprehensive Building, Industrial Park, Tunxi Village, Yanghu Town, Tunxi District, Huangshan City, Anhui Province
  • Tel:18367799793(General manager Wei)
  • QQ:2242955959
  • mailbox:2242955959@qq.com

Mobile station

WeChat public number

偷窥50个美女撒尿 <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <文本链> <文本链> <文本链> <文本链> <文本链> <文本链>