Anhui Climbing Tiger Development Equipment Co., Ltd.

Water expansionposition:homeWater expansion

Myanmar Bridge

date:[2018-10-29]     pk_hits:
Myanmar Bridge

Water Expansion Equipment - Myanmar Bridge


I. Project Name: Water Expansion Equipment - Myanmar Bridge


Second, the project specifications: 10 * 1.2 * 2.5m (length * width * height)


Third, the project material: Ф 159mm steel pipe, Ф 76mm steel pipe, wire rope, etc.


4. Project introduction: When the operator passes, grasp the steel wire ropes on both sides of the body with both hands, and step on a steel wire rope under the foot to slowly reach the end point.


V. Project purpose:


1. To temper our good quality in a dangerous environment to maintain peace and mind;


2. Expand our comfort zone.


Six, note:


1, the length can be designed according to the width of the water;


2. This project has certain risks. Users are advised to do their best. Underage and special people need to be guarded by guardians. They need to use their bodies when using them. It is forbidden to play and play during use. It is strictly forbidden to make dangerous actions.


Previous:Plum Bridge
Next:Drilling bridge

Contact us

Contact

Welcome to inquire
  • Add:No.119, Comprehensive Building, Industrial Park, Tunxi Village, Yanghu Town, Tunxi District, Huangshan City, Anhui Province
  • Tel:18367799793(General manager Wei)
  • QQ:2242955959
  • mailbox:2242955959@qq.com

Mobile station

WeChat public number

偷窥50个美女撒尿 <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <文本链> <文本链> <文本链> <文本链> <文本链> <文本链>