Anhui Climbing Tiger Development Equipment Co., Ltd.

Water expansionposition:homeWater expansion

Rocker bridge

date:[2018-10-29]     pk_hits:
Rocker bridge

Water expansion equipment - rocker bridge


I. Project Name: Water Expansion Equipment - Rocker Bridge (aka: Wave Bridge)


Second, the project specifications: 10 * 1.2 * 2.5m (length * width * height)


Third, the project material: Ф 159mm steel pipe, Ф 76mm steel pipe, wire rope, etc.


4. Project introduction: The operator steps on the rocker connected by the chain and passes under the swinging of the rocker.


V. Project purpose:


1. Improve team awareness, think for others, and cultivate individual team styles that help each other and cooperate with each other;


2. Train and train the team's collective efforts to find a simple and effective way to solve problems through correct thinking.


Six, note:


1, the length can be designed according to the width of the water;


2. This project has certain risks. Users are advised to do their best. Underage and special people need to be guarded by guardians. They need to use their bodies when using them. It is forbidden to play and play during use. It is strictly forbidden to make dangerous actions.


Previous:Beach landing
Next:Drilling bridge

Contact us

Contact

Welcome to inquire
  • Add:No.119, Comprehensive Building, Industrial Park, Tunxi Village, Yanghu Town, Tunxi District, Huangshan City, Anhui Province
  • Tel:18367799793(General manager Wei)
  • QQ:2242955959
  • mailbox:2242955959@qq.com

Mobile station

WeChat public number

偷窥50个美女撒尿 <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <文本链> <文本链> <文本链> <文本链> <文本链> <文本链>